Basement Shower Weekend #2

shapeimage_1

Here’s a quick shower remodel update:

  • Finished the electrical … we even put the fan on a separate switch!

  • Installed the floor drain.

  • Finished framing – made a spot for a soap niche.

  • Got the shower pan poured Friday by the same guy who did our master shower pan.

  • Installed sheet rock on the outside walls, installed the bullnose corner bead, taped and mudded.

  • Installed the Hardie Backer inside the shower.

Still to do this week:

  • Sand the sheet rock/mud walls.

  • Tape, cement, liquid-seal the inside walls.

  • Get the texture blown (professionally) sometime this week.

  • Paint the outside walls.

  • Install tile.

  • Grout.

  • Order a shower door (once the tile is done).

The goal is to be finished by the end of next weekend…